What Is a Data Center? Power, AI and Why Towns Push Back

Data centers used about 415 TWh of electricity worldwide in 2024. Here is what a data center is, why AI campuses draw so much power, and why voters push back.

Hakkı ALKANHakkı ALKAN

Published 4 min read

Illustration for what is a data center: empty aisle of blank server racks under cool blue lights, no logos

What is a data center? It is a specialized building that houses racks of servers, storage and networking gear so apps, websites and AI models can run around the clock. The U.S. Department of Energy notes that these halls can use 10 to 50 times more energy per floor area than a typical office, and that data centers and servers already account for roughly 2% of U.S. electricity use.

However, that abstract label became a ballot issue in 2026 midterms, as towns voted on bans and operators rushed new community pledges. Below is what a data center is, how it uses power, and why neighbors care.

What Is a Data Center, and What Does It Do?

For example, think of it as a factory for computation. Rows of servers take electricity, run software and talk to the internet through high-capacity fiber. Cooling systems remove the heat those chips create. Uninterruptible power supplies and generators keep the site online when the grid flickers.

Operators group sites by role. Enterprise rooms serve one company. Colocation halls rent space and power to many tenants. Hyperscale campuses, often built by cloud and AI firms, can stretch across hundreds of megawatts and look more like industrial parks than office IT closets.

In other words, nothing mystical happens inside. Email, maps, video calls, game downloads and large language model inference all need the same basics: silicon, power, cooling and a fast path to users. The difference with modern AI is density. Accelerated servers pack far more watts into each rack than a traditional web host.

How Much Power Does a Data Center Use?

The International Energy Agency estimates global data center electricity use at about 415 terawatt-hours in 2024, or roughly 1.5% of world electricity. Its Base Case sees that rising to about 945 TWh by 2030, just under 3% of global demand and a bit more than Japan uses today.

Additionally, local numbers feel larger than the global share. The IEA says the United States took about 45% of that 2024 load, China about 25% and Europe about 15%. In the U.S., data centers are on course to drive nearly half of electricity demand growth through 2030. For a single prompt the draw looks tiny, on the order of a fraction of a watt-hour, but the fleet effect is what shows up on utility plans. We break those prompt-level figures down in our guide to how much energy AI uses.

Meanwhile, water and land matter too. Many halls use evaporative cooling or nearby plants need water for generation. Sites also need substations, transmission upgrades and construction traffic. Those local costs, not the 1.5% global share, are what show up at town meetings.

Why Are People Voting Against Data Centers?

In short, opposition usually clusters around four themes: higher power bills if costs spill onto households, noise from chillers and generators, water stress in dry regions, and the sense that tax deals favor distant tech firms over neighbors. In November 2026, dozens of U.S. local measures sought bans or stricter rules. Coverage of Ohio data center bans and the post-election freeze risk for Texas data centers shows how state and city politics now sit inside the AI buildout story.

As a result, investors noticed. Shares tied to data center landlords and AI cloud builders swung after the midterms as markets priced slower permitting and tougher community deals. The politics are bipartisan in many counties: the fight is less about party labels than about who pays for transformers, rate cases and water rights.

What Are Operators Changing?

After the vote wave, OpenAI published a National Community Compact that ends most nondisclosure agreements with officials, pledges to cover electricity and related infrastructure costs at owned campuses, and promises public reporting on water, noise and energy. The company also highlighted demand-response deals that can shed large loads, including a Georgia Power arrangement of up to 1,000 MW. Our report on the OpenAI Community Compact walks through those pledges.

Furthermore, similar ideas appear elsewhere: on-site batteries, curtailment during peak hours under programs like OpenAI's earlier Grid Protectors effort, and clearer tax and jobs accounting. Nevertheless, none of that removes the need for power plants and wires. It does change how projects get sold to the towns that host them.

How to Read the Next Data Center Headline

Therefore, when a company announces a new campus, three numbers matter more than the press-release adjectives:

  • Peak electric load in megawatts, and whether households share any of the upgrade cost.
  • Water source and annual use, especially in drought-prone basins.
  • Construction timeline versus real interconnection dates from the utility, which often slip years.

A "data center" can be a single basement room or a multi-gigawatt cluster. Ask which one you are reading about before you judge the impact.

Our Take

What is a data center, in plain terms? It is industrial infrastructure for computing, closer to a smelter than to a smartphone. AI made the industry louder and denser, but the physics stayed the same: chips turn watts into heat and work. Communities will keep bargaining over bills, water and silence. Clearer power accounting and fewer secret deals will not end every fight, yet they are the minimum for building the next wave of capacity in places that just voted no.